On 19 July 2021, a pioneering reference renovation was carried out at Dieckmann’s storage area in Versmold. The challenge was to find a solution that could withstand the maximum load from trucks and excavators. For this demanding application, ASPHALT REPAIR MIX (ARM) was selected and professionally laid by Dieckmann
employees in cooperation with KORODUR application engineers.
ASPHALT REPAIR MIX proved to be the ideal solution for the renovation of the storage area. It is specially designed for the repair of high-traffic areas and provides exceptional resistance to heavy duty traffic.
Thanks to the cooperation between Dieckmann and KORODUR the renovation could be carried out efficiently, based on the expertise of both companies helping to ensure a high-quality and long-lasting solution.
The renovation of this reference surface at the Dieckmann storage area serves as a pioneering example of the high performance and reliability of ASPHALT REPAIR MIX in practice.