Joint repair at Wurstträgerbrunnen, Versmold
Joint repair at Wurstträgerbrunnen, Versmold

General

Categories
Rapid Set
Project
Repair of joints at the Wurstträgerbrunnen (“pig fountain”)
Location
Versmold
Country
Germany
Construction year
2024
Product
Type
Renovation
Installer
Bau-Team GmbH, Versmold

Project Description

The construction company Bau-Team GmbH carried out an extraordinary renovation of the Versmold landmark, the “Wurstträgerbrunnen” (popularly known as the “pig fountain”). An important step in this project was the repair of the joints, for which Rapid Set MORTAR MIX was used.

The choice of MORTAR MIX proved to be particularly favourable for this monument. The material is ideal for jointing paved surfaces, it offers excellent adhesion and high durability.

The professional use of this high-strength, fast-setting repair mortar not only preserved the aesthetics of the “Wurstträgerbrunnen”, but also ensured its structural stability and longevity. To this day, the “pig fountain” symbolises the close ties between the town of Versmold and the meat-processing industry.

The successful application of MORTAR MIX at the “Wurstträgerbrunnen” is an impressive example of the versatility and efficiency of this fast-setting repair mortar. Thanks to its fast-setting time, the material is not only suitable for concrete repairs, but also for the repair of monuments and other structures where fast and durable repairs are required.

RELATED REFERENCES