Sewer repair, Munich
Sewer repair, Munich

General

Categories
Rapid Set
Project
Sewer repair Nymphenburg Castle / palace grounds
Location
Munich
Country
Germany
Construction year
2013
Product

Rapid Set MORTAR MIX

Type
Renovation
Installer
Holzer Tiefbau GmbH, Degerndorf

Project Description

A landmark of Munich – the Nymphenburg Castle with its impressive park. The maintenance of the palace grounds is comprehensive and needs daily care. For instance, after the long winter in 2013, once again a manhole in the sewer system in the park needed repair. For lifting and assembling the new manhole rings – especially for the exact height adjustment – the demand was for a special mortar that provides high-strength, durability, low-shrinkage and fast setting features, thus allowing release to traffic within shortest time after repair.
The multipurpose and high performance repair mortar Rapid Set MORTAR MIX offers all these features. With MORTAR MIX the renovation works could be carried out problem-free.

MORTAR MIX is rock-solid already in 1 – 2 hours after pouring. This extraordinary and rapid strength development is based on the revolutionary, unique and powerful Rapid Set cement technology.

Besides the use for manhole regulations, the fast setting Rapid Set repair mortars qualify for the sealing of breakthroughs in channels, forming of manhole rings, berms, shoulders, edge paving or repairs – at shortest road closures.

The Rapid Set products are available exclusively through builder’s merchants.

RELATED REFERENCES